Case Studies

Case Studies

SPT (Glasgow Subway) Long Welded Rail Train


Brodie Engineering has developed from concept through to detailed design the LWR train for SPT to assist with their infrastructure maintenance. The train will be used to deliver up to 60 metre lengths of rail rather than the present 13 metres.

Click and drag the photo below to see a full 360 image of the LWR train:


360

If you think that Brodie Engineering can help your business, please get in touch.


Share this case study

View all of our services.

© 2019 Brodie Engineering
Site by SM / Powered by Couch CMS